Products types
Mechaincal equipment and accessories
Tool
Consumables
Home > The new development trend of precision casting
The new development trend of precision casting
   2014-03-10 16:57:49   

      In accordance with the requirements of the municipal Party committee, City Hall,Yanjiang District, the East New District built the practice of scientific development,harmonious coexistence region of the first area, "two" interactive demonstration area.To break through the bottleneck of the development of Yanjiang, Ziyang around the"one city three areas" development target, in active service South

New District, the old city "two" interactive development and at the same time, the implementation of municipal Party committee, not to move or retreat City Hallproposed "Kua Jiang development" strategy, starting from 2009 May, started thedevelopment history of the District, the largest city, the most magnificent building stylebattle. According to the plan, within five years, build

11 roads, 4 bridges, 5 green landscape belt and a number of municipal construction projects, the formation of "road traffic through inner and outer, fast and smooth"; built area of Administrative District People’s Hospital, central, east of primary and secondary schools and a number of other social projects, the formation of "perfect function, layout."

Supporting system; build hope city commercial complex, Howard Johnson five Stars Hotel, Binjiang business center and a number of modern service industry, the formation of "business activity, strong popularity" prosperity values; built in Ziyangbiological medicine science and Technology Industrial Park, Wang’s high-endproducts deep processing Industrial Park, plus

A number of industrial projects Po Wong Lo Kat southwest production base, to form a good situation "industrial agglomeration, city with industry".

The new strategic practice of city construction at present, the basic completion of design Tuo East sewage treatment plant, Binjiang Trade Center, Ka Tabo group and Wang Laoji of individual projects, to ensure that each project started on schedule laid the foundation construction. Central Avenue, Yingbin Avenue and 13 municipal projects of high quality

District built, vocational education, the Central Primary School 2 schools and Bao Taitown office building, the wine settle housing 5 supporting projects have been put into use, a period of the wine project completed and put into production, in Jinwan tradedevelopment the first successful opening, Central Avenue North Extension, thencapital eyebrow connection

Line, office party and government organs, the District People’s Hospital, districthospital, font Hill Park, Ziyang City, the East New District Trade Center of hope,Howard Johnson Kokusai Hotel, all projects have reached or exceeded the stageimage progress.

At present, the construction of the East New District has achieved a total investment of about 4000000000 yuan, started construction project near 70, including the completion of a project more than 20, the formation of the Road 35 km, completed 31square kilometers city city skeleton, forming the basic framework of 12 square kilometers. The district commissioned Shanghai Tongji University

Planning and Design Institute, the high scale has completed the first phase of 31 square kilometers control the preparation of detailed regulations and 10 square kilometers in key areas, an important node of city design, the formation of the "double,two axis, three area, corridor, four kilometer" space layout and the East New District"two" interactive development master plan

Overall, the "functional orientation of culture living, ecological cultivation, trade logistics, industrial agglomeration". Adhere to a high starting point planning. The East New District built "Chengdu Chongqing economic area unique hilly characteristicYishanbangshui, livable appropriate grand blueprint ecological Jiangcheng" industry is being turned into reality.

Home About us Products News Contact us

Copyright©2010 KYG MACHINERY LTD 广州市番禺区市桥镇银平路二巷自编3号 备案号:粤ICP备19157420号

TEL:86-20-34512498 / 34512033 / 34511699 FAX:86-20-34512458 www.kyg1988.com E-mail:jy@kygchina.com